How
to Colour P6 Bars Base on Activity Codes. Many people
would like to color P6 Gantt chart bars based on an
Activity Code. This is not a built in feature of the
P6 Activity Window like other scheduling products such
as Asta Powerproject. This may be achieved in P6 in
two ways..... |
|
| |
|
|
| |
Understanding
Why the P6 Update Progress Function Changes Actual Dates.
The aim of this paper is to explain why the P6 “Update
Progress” function changes “Actual Dates”
and offer suggestions to prevent this occurring. |
|
| |
|
|
| |
How
P6 Resource Driven Activities Calculate. This paper
lists a number of points that users shuld be aware off
when importing a Microsoft Project file into a P6 database.
Please contact the Eastwood Harris if there are some
points that you consider should be added to this paper. |
|
| |
|
|
| |
Notes
for importing a Microsoft Project File into a P6 Database.
The aim of this presentation shows how a P6 Resources
Driven Activities calculate, it explores the interaction
of the Resource and Task calendars and demonstrates
that P6 calculates differently to other software scheduling
software.
|
|
| |
|
|
| |
Primavera
P6 Version 7 Bars formatting presentation. The P6
bar defaults may be misleading. For example the Baseline
bars and the Negative Float bar have the same colour
and are on the same line, the Level of Effort bars are
not displayed and completed activities show Total Float.
This presentation outlines changes to the Primavera
default bar formatting that should be considered and
as a result your schedule should be clearer.
If you want to save a lot of time formatting your own
P6 Layout then you may wish to click here and download
the primavera .com.au layout by clicking here>>>
www.primavera.com.au_Layout.plf.
THIS IS A ZIP FILE AND WILL NEED UNZIPPING. . The bars
have been sorted out and minor changes have been made
to the Page Setup so the header displays project information
such as dates, project name and page numbers are seen
on every page and the footer only contains information
required on the first page such as the Gant Chart ledgend
and Revision Box. |
|
| |
|
|
| |
What
Primavera P6 Baseline Bars am I Displaying? The
aim of this presentation is to explain the different
types of project schedule Baselines, how the Planned
Dates are calculated, why the Planned Dates often display
irrelevant data, the issues with the Planned Dates,
what functions control the display of the Planned Dates
as Baseline Dates, and how to ensure you have the Baseline
dates and not the Planned Dates displayed as Baseline
Bars.
|
|
| |
|
|
| |
AStep-By-Step
Guide Using Software Development Kit(SDK) for Primavera
Version 6.X schedule preparation by: Jeoffrey B. Reyes
Sr.Planning Engineer Building Works / Road & Infrastructure
Jubail Industrial City, K.S.
|
|
| |
|
|
| |
Importing Microsoft Project 2003 – 2010 files
into Oracle Primavera P6 Version 7. - Microsoft
Project and Oracle Primavera P6 Version 7 calculate
differently. It is unlikely that a schedule will calculate
the same dates and other values such as durations and
resource data in both packages unless the schedules
are very simple or a large amount of manual manipulation
is applied after conversion, down load and read on...............
Presented by Paul E Harris at several meetings in Australia
in October and November 2010.
|
|
| |
|
|
| |
Cashflowing with Expenses in P6 by importing for an
excel spread sheet. - Presented by Paul E Harris
at the Insync10 conferance in MelbourneAugust 2010and
updated in September 2011.
Download
associated files.
|
|
| |
|
|
| |
Primavera Bars Tricks and Traps. - The defaults
setting for the display of bars in Primavera P6 can
be greatly improved with some formatting, this presentation
outlines the issues and solutions. Presented by Paul
E Harris at thePrimavera User Group in Melbourne June
2010.
|
|
| |
|
|
| |
Issues and Solutions facing Construction Contractors Implementing
Primavera P6. - Presented by Paul E Harris at the
my PRIMAVERA09 Peak Project Performance conference in
Melbourne. (633KB - June 2009 ) |
|
| |
|
|
| |
Asta Power Project to Primavera Version 5.0 Import and
Export - Some notes written by Paul E Harris on the
process of exporting schedules from Asta PowerProject
to Primavera Version 5.0 (449 KB - July 2007) |
|
| |
|
|
| |
P3
and Tilos data Interchange - A paper written by Paul
E Harris on the import and export of data between Asta
Tilos, a Linear scheduling software package from Germany.
(1,356 KB - July 2007) |
|
| |
|
|
| |
Theta
Planning - This document has been compiled by Andrew
Dick to assist in setting up a Primavera Enterprise project
to enable resource scheduling to be achieved. (4,966 KB
- July 2007). Click
here to download associated XER files. |
|
| |
|
|
| |
Asta
Power Project - an introduction - This document is
designed to assist people who are using SureTrak, P3,
Primavera Enterprise or Microsoft Project to learn the
basics of PowerProject to create an unresourced schedule.
(1,525 KB - Updated July 2009v) |
|
| |
|
|
| |
Using
P3 Batch to Rebuild Corrupt P3 Files - The process
used by Paul Harris to rebuild corrupt files. This is
a zip file that includes instructions and bat files. ((32KB
- July 2007) |
|
| |
|
|
| |
Importing
and Exporting data to and from P3 using Excel and DBF
format - This is a step by step guide on how to complete
this process. (278 KB - June 2007) |
|
| |
|
|
| |
Comparison
of EVM Standards - The comparison of AS4817 Project
performance using Earned Value 2006, ANSI/EIA-748-A-1998
Earned Value Management Systems and PMI Practice Standard
for Earned Value Management (163 KB - 3 July 2006) |
|
| |
|
|
| |
Guidelines
for training people in using Planning and & Scheduling
software - The aim of this paper is to outline some
guidelines for organizations to structure their training
as part of implementation of Planning and Scheduling software
for the planning and control of projects. (151 KB - May
2005) |
|
| |
|
|
| |
Guidelines
for Implementing P&S Software - The aim of this
paper is to outline some guidelines for organizations
to use when looking at implementing a corporate project
planning and scheduling system. Many of these guidelines
equally apply to the implementation of a stand alone planning
and scheduling system. ( 314 KB - April 2004) |
|
| |
|
|
| |
Practical
Application of Earned Value Performance Measurement Using
P3 - The aims of this presentation is to review practical
methods that may be used for managing projects using Earned
Value Performance Measurement methods.((307 KB) |
|
| |
|
|
| |
Book
Review Guide - A guide for people writing books reviews
(158 KB - September 2003) |
|
| |
|
|
| |
SureTrak % Calculation - This article explains how
SureTrak calculates percent complete in the various fields
available. ((102 KB) |
|
| |
|
|
| |
Linking
P3 Database with Excel or Access - This article demonstrates
how a P3 schedule database may be linked to Excel or a
dbf file using the Pervasive ODBC drivers. (278 KB) |
|
| |
|
|
| |
Techniques
for Managing Complex Projects with Planning and Scheduling
Software - This paper will discuss techniques that
may be used for developing and managing schedules that
have a large number of activities and a number of complex
relationships. (246 KB) |
|
| |
|
|
| |
Converting
P3 and SureTrak files to and from Microsoft Project -
This article looks at the various methods of converting
files to and from Microsoft Project and P3 or SureTrak.
(226 KB) |
|
| |
|
|
| |
Selecting
Project Management Software - This article is aimed
at assisting companies in the process of selecting new
project management software but could be applied to the
selection of many other types of software. (28 KB) |
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |